Canada’s energy regulator green-lit a last-minute change to the Trans Mountain pipeline methodology, paving the way for the $35-billion project to finally get fully built.

  • WHARRGARBL@kbin.social
    link
    fedilink
    arrow-up
    9
    arrow-down
    1
    ·
    10 months ago

    Came here to shout at the horror show being planned with this crude oil pipeline crossing the Cascade Mountains, a pristine area which is in the Ring of Fire.

    Then I read the details and holy fuck what a boondoggle! IF this shit doesn’t destroy the environment, Canadian taxpayers will still be in the hole for tens of billions of dollars. This whole thing stinks of corruption. Someone is getting sweet kickbacks.