Solar and wind power generation has set a new record, with more power generated than coal for the first five months of 2023.

  • altus@sh.itjust.works
    link
    fedilink
    English
    arrow-up
    3
    ·
    1 year ago

    The last line of the article I can personally attest to. I am trying to install solar panels on my house and the interconnection approval has taken over 8 months and I expect the overall project will be well over a year. It was originally planned to be up and running in 6 months.

    • eleitl@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      edit-2
      1 year ago

      I haven’t bothered with approval and installed an illegal 1.6 kWp system, and illegally (but safely) have the meter running backwards some of the time. Averaging 6 kWh/day so far. So make about half of the electricity I consume in a year.

      I will probably add some storage next year, or so.